This is something that has been debated by the IAF and the MoD, which have considered all options before making a decision to upgrade 51 Indian Mirage 2000 fighter jets to the -V standard. Since there is still a lack of clarity about the value of the upgrade contract, let me put down what best I know at this stage (the figure in the infographic below is a consolidated figure that includes the cost of weapons and infrastructure). The cost of upgrade contract is understood to be $2.7-billion. The cost of the weapons component is $700-million, and the cost of infrastructure between $500 too 600 million.
<br> <a href="http://polldaddy.com/poll/5236038/">Is India paying too much to upgrade its Mirage 2000s?</a><br>
Labels: AIR FORCE , Aircraft And Helicopters , Controversy , EQUIPMENT UPGRADES